Oracle神諭

            BlogJava :: 首頁 :: 新隨筆 :: 聯(lián)系 :: 聚合  :: 管理 ::
            284 隨筆 :: 9 文章 :: 106 評論 :: 0 Trackbacks

          For each order proposal, the system calculates the date that it must be converted into either a purchase order or a production order so that the purchase order can be sent to the vendor on time or the production order can be transferred to production on time. Naturally, the vendor can only deliver the ordered quantity punctually if he receives the purchase order on time. The same applies to production - the ordered quantity can only be produced according to schedule if the production order is received on time.

          posted on 2008-06-19 23:00 java世界暢談 閱讀(215) 評論(0)  編輯  收藏 所屬分類: 供應(yīng)鏈及物流
          主站蜘蛛池模板: 丁青县| 漳州市| 泸溪县| 安义县| 隆林| 临汾市| 图们市| 泰顺县| 论坛| 文化| 广州市| 阳新县| 保亭| 叙永县| 泗阳县| 靖州| 资溪县| 静宁县| 文登市| 镇坪县| 天等县| 涞水县| 靖江市| 麻栗坡县| 洛阳市| 会东县| 波密县| 印江| 杭锦旗| 廉江市| 电白县| 福泉市| 沙坪坝区| 大足县| 鄄城县| 阿拉善右旗| 乌什县| 郴州市| 遂昌县| 康乐县| 泰安市|